In 2023. Rectify Group undertook a significant construction project in Hampton, Victoria, involving the development of a multi-story apartment block with an underground basement. As a crucial aspect of the construction process, our team was tasked with ensuring the stability of the soil and preventing any potential soil collapses during the construction of the basement.
Warehouse stability is essential for businesses that rely on it for storage and operations. This case study explores the successful remediation of a 63m x 25m warehouse that had subsided by 70mm due to water flowing under the internal slab from a neighboring property. The project involved the use of a combination of injection materials, specifically SJ-60 and SJ-40, to lift and stabilize the slab, with the entire operation completed in just seven days.
In the realm of construction and property development, ensuring the structural integrity of buildings is paramount. This case study delves into the challenges faced by a chemical underpinning company tasked with rectifying subsidence issues in five houses, caused by poor drainage and construction practices. The project involved the utilization of injection works both internally and externally to lift and close the cracks, ultimately restoring stability to these properties.